The construction of the High -speed Railway of the Shanghai -Chongjiang River to the Wait of Wuhan (January 2) started construction. A total of eight stations such as Hefei South, with a construction period of four and a half years.

The surging news learned from the National Railway Group of China that the Shanghai -Chongjiang high -speed railway Hefei to the Wuhan section (referred to as the along the river high -speed railway section) started construction on Tuesday.

The High -speed Railway Hewu section along the river is located in Anhui and Hubei Province.The railway hub, Wuhan to Yichang section of the High -Rong high -speed railway along the High -River high -speed rail from Wuhan Tianhe Station.

This line is about 360 kilometers in length, and the design speed is 350 kilometers per hour. A total of eight stations such as Hefei South, the construction period is four and a half years.

China News Agency reported that the high -speed railway section along the river is an important part of China's "eight vertical and eight horizontal" high -speed rail network along the river. The status of the road network is very important.After the completion of the High -speed Railway High -speed Railway, a new high -speed railway channel will be formed between Hefei to Wuhan to further optimize the layout of the Yangtze River Economic Belt Railway Network.