China Space Station Mengtian Experimental Mission Saturday (29th 29th) Organizational launching systems are jointly practiced throughout the system.At present, the system is in good condition, and preparations are being prepared before the Rockets are planned as planned.
According to Xinhua News Agency, this task is the end of the space station in the rail construction. The front of the Long March 7 is parallel, and then the task of Tianzhou 5 is in depth.Design, quality control and resource coordination have brought great challenges.
Reporting, Wenchang Aerospace launches has been organized to complete the testing and addition of the Mengtian Experimental Card Technology Zone for several days, and the Long March 5 Lotor Rockets Vertical assembly test, the coil arrow joint test, the combined body vertical transfer, etc.Work, and strictly carry out functional testing and data interpretation comparison in strict accordance with standards.
Zhong Wen'an, chief engineer of the Xichang Satellite Launch Center, said: "We have completed the overall assembly test, joint operation, joint general inspection and other work.In good condition, the weather meets the requirements of the weather. We are confident and determined to successfully complete the launch task and contribute to the construction of a aerospace power. "