(Beijing Comprehensive News) After the official and local media reported that the project had the problem of cutting corners and major safety hazards, Chinese officials were investigating a high -speed rail connecting a high -speed rail connecting a high -speed rail of Laixi City and Rongcheng City, northern Shandong Province.
Comprehensive Reuters and Economic Reference Reports, Labor sub -contractor of Shandong Lairong High -speed Railway Third Bid Section, Henan Sanjie Industrial Co., Ltd. Real -name Reporting Project Construction General Contracting Unit China Eighth Engineering Bureau Co., Ltd.For those who are suspected of cutting corners, there are quality problems in the construction of thread piles in some road base sections. The construction piles of most threaded piles in this section do not meet the design requirements, and there are major safety hazards.
Lairong High -speed Railway is a major project in Shandong Province, with a total length of 193 kilometers, with a total investment of 29.7 billion yuan (S $ 5.485 billion) and a design speed of 350 kilometers per hour. Construction started in November 2020. It is expected to be opened at the end of October 2023.Operating conditions.Sanjie is one of the labor service subcontractors in this bidding section, and is responsible for the drilling of the base piles of the base section of some roads.The company stated that he had repeatedly reported the problem of insufficient construction piles to the heads of the project department and on -site personnel of the China Construction Eighth Bureau.
It is reported that the Shandong Provincial Department of Transport has set up an investigation team to comprehensively investigate and verify the above reports in conjunction with relevant parties.