As China's first large -scale shale gas field in commercial development, the cumulative gas production of Sinopec Fuling Shark Field has exceeded 60 billion cubic meters.
Xinhua News Agency reported the above news on Sunday (September 24).Fuling shale gas fields are distributed in Fuling, Nanchuan, Wulong, Zhongxian, Liangping, Fengdu and other districts and counties in Chongqing City. Construction began in December 2012. It was put into commercial development in March 2014.One of the sources.
As of now, the cumulative proven reserves of gas fields have nearly 900 billion cubic meters, and Nissan shale gas is about 23 million cubic meters.
Since the development of gas field development, a comprehensive evaluation, development design and optimization of shale gas geology, high -efficiency fracture of long level wells, supporting gas collection, and green development have been formed.The core technologies of the rock gas efficiently develop, and at the same time give full play to the advantages of the entire industry chain, independently develop equipment and tools such as electric drilling rigs and full -length fracturing units. The key equipment all realizes Chinese domesticization.