(Beijing Comprehensive News) The third aircraft carrier of China, Fujian ship, skipped the aircraft carrier construction process, and is currently conducting a tiered test.Military experts analyze that the Fujian ship is expected to complete the tiered and sailing tests in about one and a half years, and after that, it can be officially transferred to the Navy to serve.
Public information shows that the Fujian ship port number 18 is the first aircraft carrier in China to adopt a flat long flight deck, electromagnetic ejection and blocking device.About 76 meters wide.
Comprehensive China CCTV News and Beijing Youth Daily reported that the construction process of aircraft carriers mainly includes: projects, construction (after segments were assembled as a whole), launching, dumping, moving, and sea trials.
Compared with China's first domestic aircraft carrier Shandong ship, the Fujian ship skipped the "dressing" session and directly entered the last level of the "tiered inspection" before going out to the sea test. The construction of the aircraft carrier was basically completed.
It is reported that the peripheral test is based on the end of the installation of electromechanical equipment and systems. The purpose is to check the integrity and reliability of the manufacturing and installation of hulls, machinery equipment, electrical equipment and power installations.
Chinese military expert Zhang Junshe stated in an interview broadcast on the CCTV military channel on September 25 that the Fujian ship must conduct a tiered test and navigation test to see if the aircraft carrier can meet the design requirements, and the problems can be improved in a timely manner.
He said that after these experiments were completed, the Fujian ship was prepared to be officially transferred to the Navy to serve.
Chinese military commentator Song Zhongping analyzed in an interview with the Beijing Youth Daily that during the construction of the dock, many systems and equipment have been installed simultaneously during the construction of the dock, which greatly simplifies or even skipped the dumping link after the water.Create the creation conditions of the system of moving tests directly in various systems, which is objectively saving the construction period.
On this basis, Song Zhongping predicts that for the time of the Fujian ship, Song Zhongping predicts that there should be about one and a half years, which should be basically completed.