(Morning News) The longest tunnel of the Yawan high -speed rail in Indonesia was smoothly interacted on the afternoon of February 18th, and it went through. This marks elegantThousands of high -speed rail have made major progress in key control projects.
The No. 6 Tunnel of Yawan High Speed Rail is located in the territory of Pawakada, northwest side of Wanlong, Indonesia.The group is responsible for construction.The total length of the tunnel is 4478 meters, which is the longest tunnel on the entire Yawan high -speed rail.
The Yawan High -speed Railway started construction in August 2018.According to the person in charge of the construction party quoted by the China News Agency, the tunnel belongs to the low mountain hilly area. The geology is a clay, mud rock, and volcanic gravel accumulated from the early volcanic eruption, and the water level in the tunnel is high.Buried layer, it is difficult to build.
The total length of the Yawan high -speed rail line connecting the Indonesian capital Jakarta and the fourth largest city Bandung is 142.3 kilometers in length, and the design speed is 350 kilometers per hour.After the opening of traffic, Jaca's travel time will be shortened from more than three hours to 40 minutes.