China ’s second domestic cruise ship on Monday (August 8) officially started construction at Shanghai Waigaoqiao Shipbuilding Co., Ltd., a subsidiary of China Shipbuilding Group Co., Ltd.This marks that China's ship industry has initially grasped the key core technologies of large cruise design and construction. While opening the new era of "two -wheeled drama beads", it has taken a milestone step into the mass of large cruise ships and series.
Comprehensive China News Network and Surging News reports, large cruise ships can directly reflect a country's equipment construction capacity and comprehensive science and technology level.Make full efforts to promote large -scale cruise ship design and construction is a landmark project of China's shipping industry's transformation and upgrading and enhancing China's influence in global influence.
On October 18, 2019, China's first large -scale cruise ship (H1508 ship) officially started to enter the substantive construction stage. The Chinese ship industry has moved forward in the journey of "picking the most dazzling pearl on the crown"A solid step, the project is currently promoting in an orderly manner.
With the strong support of the overall command command of China Ship Group and the project partner Jia Nianhua Group and the Finkantini Group, the Waigaoqiao Shipbuilding has successively launched cruise design on the H1508 ship through the introduction of digestion and independent technological innovation., Construction, project management and other special research, and formed a series of scientific and technological innovation results.
In order to meet the requirements of SOLAS 2020, the H1509 ship has been extended by 17.4 meters compared to the H1508 ship, the total length of the hull is 341 meters, the type is 37.2 meters, the total tonnage is about 142,000, and the design eats 8.17 meters.The maximum water is 8.4 meters, the maximum speed is 22.7 knots, and the passenger compartment room is 2144, an increase of 19 more than the first ship.Rich leisure and entertainment facilities such as water parks can meet all life and entertainment needs of passengers.
Compared with the first -made cruise ship, the design and construction cycle of the second domestic large cruise H1509 ship has compressed for a full six months.At present, the detailed design of the H1509 ship has been completed by about 40%. The production and design model balance and structural production design and design are fully launched.In terms of construction, production preparations are continuously strengthening production preparations from the aspects of innovation, equipment debugging, and talent team building.